CONSTRUCTION OF A NEW TRANSPORTATION AND STORAGE COMPLEX

The complex has dimensions of 30 x 45 m and a height of 15 m. The shipping shop will increase the efficiency and safety of loading into open containers. Previously, loading was carried out in any weather outdoors with a truck crane, which was time consuming and dangerous for the operator.

The hall also has a hydraulic lifting platform with a lifting capacity of 8 tons, which will allow efficient loading of products with a forklift directly onto the body of a semi-trailer truck.

The second part of the hall is meant for storage of long and heavy metallurgical material. For these purposes, a modern 9-meter high stacker with a lifting capacity of 80 tons was installed for a six-meter bar material.