MAST CLIMBERS

The Czech concern Stros is a world leader in the production of single mast climbing work platforms. The equipment of this brand has improved properties:

  • the metal structure of the cab and gear mechanism is protected by a two-component coating, which doubles their service life;
  • safety systems include up to four stages of protection, which completely excludes the cab overturning or falling down;
  • platform control is fully automated.

Mast Climbers Solutions

WP 1000

Mast Climbing Work Platform

Max. height: 350 m
Max. weight: 1000 kg
Speed: 6 m/min
FIND OUT MORE

WP 2000

Mast Climbing Work Platform

Max. height: 350 m
Max. weight: 2000 kg
Speed: 25 m/min
FIND OUT MORE

WP 3000

Mast Climbing Work Platform

Max. height: 350 m
Max. weight: 3000 kg
Speed: 13 m/min
FIND OUT MORE

TP MX 1024

Transport platform

Max. height: 200 m
Max. weight: 1000 kg
Speed: 24 m/min
FIND OUT MORE

Technical Details

Characteristics Platform
with lifting capacity up to 1000 kg
Platform
with lifting capacity 2000 kg
Platform
with lifting capacity 3000kg
Transport platform
TP MX 1024
Max. height of anchored platform 100 m 150 m 150 m 200 m
Maximal load capacity 1000 kg 2000 kg 3000 kg 1000 kg
Average speed with load 6,3 m/min 8,5 m/min 8,5 m/min
Internal platform dimensions 1 400 x 1 700 mm
Maximum platform length (single mast A) 10,14 m / 33‘–3 ¼“ 11,2 m / 36‘–9“ 11,2 m / 36‘–9“
МMaximum platform length(two mast B) 29,33 m / 96‘–2 ¾“ 26,13 m / 85‘–8 ¾“
Average speed without load 25 m/min 13 m/min
Platform width + extension (C+D) 1,42 + 0,65 m 1,6 + 1,55 m 1,6 + 1 m, 5‘–3“+3‘–3 3 “
Engine power under load 100% 4‘–8“+2‘–1 ½“ 5‘–3“+3‘–1 3 “ 2×2,2kW / 2×3HP 3×2,2kW / 3×3HP
Max. height of freestanding platform 1×3kW / 1×4HP 8 m / 26‘ 22 m / 72‘ 22 m / 72‘
Voltage system 3 NPE ~ 50 Hz 400 V 3 NPE ~ 50 Hz 400 V 3 NPE ~ 50 Hz 400 V


Work Platforms

Mast-type work platforms are lifting devices for construction materials, tools, equipment. Some models (TP MX 1024) also allow people to be lifted. Their design consists of the following elements:

  • work cabin with sideboards, sometimes with a roof;
  • metal mast, which serves as a support for the movement of the cab;
  • electric drive with two or three motors;
  • gear mechanism;
  • security systems.

Our company is the official facade access mast climber of Stros lifting equipment in the Sharjah UAE. We offer work platforms at prices recommended by the manufacturer. You can also order from us the rental of lifts and original spare parts for them.

OUR ADVANTAGES

Flexible working conditions Individual approach to each client.
Search for solutions in non-standard situations
Professional installation We make professional installation of mast lifts
Delivery from warehouse We deliver the equipment you purchased to the facility
Availability of spare parts Main consumables and spare parts are in stock
Large equipment park Large, constantly updated range of equipment
Honest prices We offer a price without intermediary markups

OBJECTS WE HELP TO BUILD

58th Street, NY, USA
Turkey, Istanbul 3rd Bosphorus Bridge
Madison Square Garden, NY, USA
Russia, Moscow Mercury City Tower
Russia, Moscow OKO, Complex
St. Petersburg, Russia
Russia, Krasnogorsk Crocus City, Project
Russia, St. Petersburg Lakhta Center, Project
Turkey, Istanbul 3rd Bosphorus Bridge
Turkey, Istanbul 3rd Bosphorus Bridge

Certificates and Documentation

ISO 9001
Lifting Equipment
Commercial License

FAQ

Yes, this option is provided. Structurally, the internal consoles are made to extend up to 1.6 m. The presence of mechanical sliding decks allows you to overpass brows and shelves that may be on the building. The extension process is controlled by a limit switch - this will help avoid collision when adjusting the height.
Yes, it can be done. We can adapt the work platform to suit curved facades as well as corners.
When buying equipment from STROS, our specialists conduct both introductory classes on working with lifts and accredited training sessions.
This will be realistic if the customer can correctly plan the access sequence to the places where the mast platforms will be used. In this case, it is possible to minimize the duration of hiring specialists for a particular type of work.
Yes, that's right. It will take about 2/3 of the working day to install mast platforms on a working area of 200 m2. If scaffolding was used, it would take 4 times as long.
The duration of the lease of mast lifts may be exceeded, but the work completion time should not differ greatly. Using scaffolding will require significantly more time and labor costs, which can result in the total rental cost exceeding the originally planned budget.
No piece of equipment is immune to breakdowns. To reduce the likelihood of their occurrence, you should choose a known supplier that has a good reputation and provides quality service. Finding a cheap supplier can lead to serious problems and great financial damage in the future.
Yes, all the equipment that we supply undergoes mandatory tests and checks. Their results are confirmed by the relevant test and conformity certificates, which are provided with the lifts.
GET A COMMERCIAL OFFER
We will select a lift suitable for your project, tell the timing and cost of implementation Name
Khaled Al-Sharif
Sales Manager